How to Apply for PM Surya Ghar Muft Bijli Yojana: Step-by-Step Guide

After understanding the benefits of the PM Surya Ghar Muft Bijli Yojana, let’s walk through the step-by-step process to apply for this scheme. By following these steps, you can easily get rooftop solar panels installed at your home and start enjoying free electricity up to 300 units per month.


Step 1: Visit the Official Portal

The first step is to access the official portal for the scheme. Here’s how to get started:

  • Go to the website: www.pmsuryaghar.gov.in.
  • This portal provides all the information you need regarding system sizes, vendor selection, and subsidy benefits.

Step 2: Register Yourself

  1. Select Your State and DISCOM: After landing on the homepage, select your state and electricity distribution company (DISCOM).
  2. Enter Consumer Details: Provide your Electricity Consumer Number, Mobile Number, and Email ID. These are required to verify your electricity connection.
  3. Submit: After filling in the details, submit the form to create your account.

Step 3: Log in to Your Account

Once you’ve registered:

  1. Login with your consumer number and mobile number.
  2. You will receive an OTP (One-Time Password) for verification on your mobile number. Enter this to successfully log in.

Step 4: Fill Out the Rooftop Solar Application

  1. Access the Application Form: Once logged in, navigate to the section for applying for rooftop solar installation.
  2. Fill Out Required Details: You’ll need to provide details such as your roof size, electricity usage, and preferred solar panel size.
  3. Submit Application: After entering all the required details, submit the application form.

Step 5: Feasibility Approval

  1. DISCOM Approval: After submitting your application, your electricity provider (DISCOM) will conduct a feasibility check. This involves assessing whether your home is suitable for solar installation.
  2. Approval Notification: Once the feasibility check is successful, you will receive approval for the installation.

Step 6: Choose a Vendor and Install

  1. Select a Vendor: After receiving approval, choose a registered vendor from the list provided on the portal. Ensure the vendor is certified to install rooftop solar systems under the scheme.
  2. Installation: The vendor will schedule a time to install the solar panels at your home. The installation process typically takes a few days.

Step 7: Apply for Net Metering

  1. Net Metering Application: Once the installation is complete, apply for net metering through the portal. This allows you to send any excess electricity generated by the solar panels back to the grid and receive credits on your electricity bill.
  2. DISCOM Inspection: Your DISCOM will inspect the solar installation and meter before activating the net metering system.

Step 8: Receive Subsidy

  1. Submit Bank Details: After the net meter installation and approval, submit your bank account details and a canceled cheque on the portal to receive the subsidy.
  2. Receive Subsidy: The subsidy amount will be credited to your bank account within 30 days after submission.

Cost and Subsidy Details

  • Subsidy Amount: The government provides a subsidy of up to ₹78,000 for a 3 kW system.
  • Additional Loans: If needed, you can also avail collateral-free loans at 7% interest for the installation.

By these steps, you’ll be able to complete your application and enjoy the benefits of free solar electricity under the PM Surya Ghar Muft Bijli Yojana.